Too good drake ft rihanna free audi download. Download User instructions of VOKERA Excel 25 Boiler for Free or View it Online on All-Guides.com.
Mynute 24M 2350973 (846) 2350975 (848) Vokera Cod.E141 Rev.4.0 (05/08) Wall hung boilers Mynute 24 M. Fascia/Case Components Drawing 1 2 270 18 31 226 90 1 300 26 40 20 21 27 226 28 78 12 10 78. Vokera reserve the right to change the specifications without prior notice. Vokera Boiler Manuals. Following are Vokera Boiler Manuals. If there are any particular manuals you are unable to find, please get in touch. Search box To search by GC No you need to enclose with speech marks ie “41-xxx-xx”, To see the link in mobile mode please turn your device to landscape mode or use scroll table to left. If you are unable to find your manual submit a request at. View and Download VOKERA Mynute EHE installation & servicing instructions manual online. High efficiency system boiler. Mynute EHE Boiler pdf manual download. Free Boiler Manuals, Free Gas Manuals, Gas Documents. Vokera Boiler Manuals. UM.pdf Linea Plus AG ISM.pdf Linea Plus AG UM.pdf Maxin 24e 28e ISM.pdf Maxin 24e 28e UM.pdf Mynute 10e 14e 20e ISM.pdf Mynute 10e 14e 20e UM.pdf Mynute 10SE 14SE 20SE ISM.pdf Mynute 10SE 14SE 20SE UM.pdf Mynute 12 48 RSE ISM.pdf Mynute 12 48 RSE UM.pdf Mynute. VOKERA Excel 25 User Instructions. Download User instructions of VOKERA Excel 25 Boiler for Free or View it Online on All-Guides.com. Vokera Mynute 24m User Instructions. VOKERA Unica BHE Installation & Servicing Instructions Manual Installation & servicing instructions manual (40 pages) VOKERA Mynute 12HE Installation And Servicing.
Brand: VOKERA
Category: Boiler
Type: User instructions
Model: VOKERA Excel 25 , VOKERA Excel 29
Pages: 36
IMPORTANT
The vertical ue terminal is 1.0 metre in length and cannot be
cut; therefore it may be necessary to adjust the height of the
Connect the vertical ue assembly to the boiler ue spigot us-
ing the 100mm clip, gasket & screws (supplied), ensuring the
correct seal is made. The ue support bracket (supplied with
If the vertical ue requires extension/s or additional bend/s,
connect the required number of ue extensions or bends (up
to the maximum equivalent ue length) between the boiler and
Ensure that any horizontal sections of the ue system have a
minimum 1º; maximum 3º fall back to the boiler (1º = 17mm
NOTE
When cutting an extension to the required length, you must
ensure that the excess is cut from the plain end of the exten-
sion. Remove any burrs, and check that any seals are located
You must ensure that the entire ue system is properly sup-
4.5.3 TWIN FLUE SYSTEM
The Vokèra twin ue system enables greater ue distances
to be achieved than that of a concentric ue system. It can be
used for horizontal or vertical applications, however the twin
ue system must be converted to the dedicated concentric
ue kit for termination. It is essential that the installation of the
twin ue system be carried out in strict accordance with these
GUIDANCE NOTES ON TWIN FLUE INSTALLATION
• The ue must have a have a minimum 1º; maximum 3º (1º =
17mm per 1000mm) fall back to the appliance to allow any
condensate that may form in the ue system to drain via the
condensate drain. Consideration must also be given to the fact
that there is the possibility of a small amount of condensate
• Ensure that the entire ue system is adequately supported,
• The entire ue system must be adequately insulated to
maintain heat within the ue system thereby reducing the
• As the exhaust outlet pipe can reach very high temperatures
it must be protected to prevent persons touching the hot
• The condensate drain pipe must be connected in accordance
Reduction for bends
0225805 Horizontal ue terminal 1.0 metre
359 Twin adapter kit N/A
532 Flat roof ashing plate N/A
0225820 0.25m extension (pair) 250mm
Vokera Mynute 24m Manual Download Online
0225830 1.0m extension (pair) 1000mm
0225840 45º bend (pair) N/A
0225850 Twin bracket (5) N/A
MOUNTING THE BOILER
The xing holes for the wall-mounting bracket should now be
drilled and plugged, an appropriate type and quantity of xing
should be used to ensure that the bracket is mounted securely.
Vokera Mynute 24m Manual Download 2017
HORIZONTAL TERMINATION (g. 13c)
The twin ue system must be converted to the dedicated con-
• The horizontal terminal is supplied with a built-in converter
• A 130mm hole is required for the passage of the concentric
• The air inlet pipe must always be level with or below, that of
Depending on site conditions it may be preferable to install the
terminal assembly prior to tting the twin ue pipes.
Mark and drill a level 130mm hole for the passage of the horizontal
ue terminal. Insert the terminal assembly into the ue hole.
Push-t the twin ue pipes onto the concentric to twin converter
box ensuring that the exhaust pipe connects to the exhaust
If necessary cut the plain ends (male) of the twin ue pipes to
allow connection to the concentric to twin converter.
Before cutting twin ue pipes ensure allowances have been
made for connection onto the previous piece and onto the con-
centric to twin converter. The last twin ue pipes must be pushed
50mm onto the male spigots of the concentric to twin converter.
Seal the ue terminal assembly to the wall using cement or a
suitable alternative that will provide satisfactory weatherproof-
ing. The interior and exterior trim can now be tted.
The twin ue system must be converted to the dedicated con-
• The vertical terminal is supplied with a built-in converter box
Once the bracket has been secured to the wall, mount the ap-
INSTALLATION OF TWIN ADAPTOR KIT (g. 13a-13b)
• Insert the exhaust connection manifold (A) onto the appliance
![]()
• Remove the blanking plate (located to the left of the appliance
ue outlet) and – using the same screws – install the air inlet
• Using the hole in the exhaust connection manifold as a guide,
drill a 3mm hole in the appliance ue spigot and secure the
exhaust manifold connection to the ue spigot using the screw
• Using the two holes in the air inlet plate as a guide, drill a
3mm hole in each and secure the air inlet pipe/bend using
The twin ue pipes extensions and accessories can now be
installed by pushing together (the plain end of each extension
or bend should be pushed approximately 50mm into the female
B
C
Bend Reduction in maximum ue length for each bend
Fig. 13b
Related Products for VOKERA Excel 25Related Manuals for VOKERA Excel 25VOKERA Excel 25: Frequently viewed ManualsVokera Boiler Manuals
20 80 CF & 24 96 Flowmatic ISM.pdf 20 80 CF & 24 96 Flowmatic UM.pdf 20 80 RS Flowmatic ISM.pdf 20 80 RS Flowmatic UM.pdf 20 80 RSS Flowmatic ISM.pdf 20 80 RSS Flowmatic UM.pdf 24 96 RSE Flowmatic ISM.pdf 24 96 RSE Flowmatic UM.pdf Compact A Combi Boilers (25A-29A).pdf Compact HE Combi Boilers (25HE-29HE-35HE).pdf Compact HE Combi Boilers (25HE-29HE-35HE) IM.pdf Compact SE ISM.pdf Compact SE UM.pdf CondexaPRO Light Com Boilers (50M 100M 100S) IM.pdf Eclipse ESC ISM.pdf Eclipse ESC UM.pdf Eclipse ESS ISM.pdf Eclipse ESS UM.pdf Elidra 24 96 AGM ISM.pdf Excell 80E 96E (New Hydraulics) ISM.pdf Excell 80E 96E (New Hydraulics) UM.pdf Excell 80E 96E (Old Hydraulics) ISM.pdf Excell 80E 96E (Old Hydraulics) UM.pdf Excell 80SP (New Hydraulics) ISM.pdf Excell 80SP (New Hydraulics) UM.pdf Excell 80SP (Old Hydraulics) ISM.pdf Excell 80SP (Old Hydraulics) UM.pdf Hydra ISM.pdf Hydra UM.pdf Linea 7 ISM.pdf Linea 7 UM.pdf Linea 24 28 ISM.pdf Linea 24 28 UM.pdf Linea HE Combi Boilers (28HE-32HE-36HE) ISM.pdf Linea HE Combi Boilers (28HE-32HE-36HE) UM.pdf Linea Max HE Flr Standing Combi Boiler (28HE) IM.pdf Linea Max HE Flr Standing Combi Boiler (28HE) UM.pdf Linea Max SE ISM.pdf Linea Max SE UM.pdf Linea One Combi Boilers UM.pdf Linea Plus AG ISM.pdf Linea Plus AG UM.pdf Maxin 24e 28e ISM.pdf Maxin 24e 28e UM.pdf Mynute 10e 14e 20e ISM.pdf Mynute 10e 14e 20e UM.pdf Mynute 10SE 14SE 20SE ISM.pdf Mynute 10SE 14SE 20SE UM.pdf Mynute 12 48 RSE ISM.pdf Mynute 12 48 RSE UM.pdf Mynute 12 48 RS ISM.pdf Mynute 12 48 RS UM.pdf Mynute 12HE-15HE-20HE-25HE-30HE-35HE IM.pdf Mynute 12HE-15HE-20HE-25HE-30HE-35HE UM.pdf Mynute 14 48SE, 20 70SE ISM.pdf Mynute 14 48SE, 20 70SE UM.pdf Mynute 14 48SP ISM.pdf Mynute 14 48SP UM.pdf Mynute 28 96SE ISM.pdf Mynute 28 96SE UM.pdf Mynute 28E 35E ISM.pdf Mynute 28E 35E UM.pdf Mynute 28SE ISM.pdf Mynute 28SE UM.pdf Mynute Open Vent Boiler (20VHE) IM.pdf Mynute Open Vent Boiler (20VHE) UM.pdf Mynute VHE Open Vent Boilers (12VHE-15VHE) UM.pdf Neutro Biomass Pellet Boiler (14kW) IM.pdf OpenTherm Control (611) IM.pdf Option ISM.pdf Option UM.pdf Pinnacle 16 & 26 ISM.pdf Pinnacle 16 & 26 UM.pdf Synergy (B) ISM.pdf Synergy (B) UM.pdf Synergy e 25 & 29 (A) ISM.pdf Synergy e 25 & 29 (A) UM.pdf Syntesi 25 & 29 (B) ISM.pdf Syntesi 25 & 29 (B) UM.pdf Syntesi e 25 & 29 (A) ISM.pdf Syntesi e 25 & 29 (A) UM.pdf Syntesi e ISM.pdf Unica BHE Balcony Combi Boilers (32BHE) IM.pdf Unica BHE Balcony Combi Boilers (32BHE) UM.pdf Unica HE Combi Boilers (28HE-32HE-36HE) IM.pdf Unica HE Combi Boilers (28HE-32HE-36HE) UM.pdf
Comments are closed.
|
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |